NXP IMX95LPD5EVK-19CM board Camera Usage Guide

πŸš€ Introduction​

This article guides you how to get started using TechNexion camera modules on NXP IMX95LPD5EVK-19CM board.


πŸ“Έ Supported Camera Modules​

Camera SeriesProducts
TEVS
TEVS-AR0144
TEVS-AR0145
TEVS-AR0234
TEVS-AR0235
TEVS-AR0246
TEVS-AR0521
TEVS-AR0522
TEVS-AR0544
TEVS-AR0821
TEVS-AR0822
TEVS-AR0830
TEVS-AR1335
TEVS-AR2020
Camera Sensor Comparison

πŸ”§ Hardware Setup Instructions​

Connect the Adapter Board and Camera Cable​

To set up TechNexion camera, connect the adapter board and camera cable to the MIPI CSI port on the EVK board.













🧰 Camera Installation Instructions​

We provide some methods to install camera driver and device tree blobs. Depending on your needs, you can choose the most suitable method. If you are new to this, we recommend starting with Method 1. If you want to customized your Yocto project or Linux kernel, you can try Method 2 or Method 3. If you have a custom Linux kernel and device tree, you can try Method 4.


Method 1 - Using TechNexion Pre-built image​

Prepare Yocto demo image for testing TechNexion camera​

To test TechNexion TEVS Series cameras, you need a demo image that includes the required Device Tree Blobs (DTBs) and camera drivers.

Download and Select the Correct Image for Your EVK​

Prebuilt demo images can be available for download via TechNexion's server.

πŸ”— Download Prebuilt Image for IMX95LPD5EVK-19CM)

Flashing the Image​

You can flash the image to an SD Card using the following methods:

Boot Mode

Make sure your EVK board is set to boot from SD card.
Refer to the official NXP guide πŸ”— i.MX 95 LPD5 EVK Quick Start Guide

Use balenaEtcher to write the image to your SD card:

πŸ”—


Method 2 - Build Yocto image with TechNexion BSP​

TechNexion supports building a Yocto-based Linux image tailored for camera modules using the following kernel and branch.

If you are using prebuilt demo image, you can skip this section. Please refer to πŸ“Έ Camera Testing Instructions section for camera testing steps.

Supported Linux Kernel​

Linux Kernel VersionYocto Branch
6.18.2tn-imx_6.18.20_2.0.0-stable

Source and Build Instructions​

πŸ”— Fetch Yocto source
πŸ“– Build Yocto (Instructions for IMX95LPD5EVK-19CM)


Method 3 - Build Linux kernel with TechNexion source code​

Clone the Kernel Source​

Fetch and compile Linux kernel.

Build Enviroment
  • Host OS: Ubuntu 22.04
  • Toolchain: aarch64-linux-gnu-gcc-11

Install cross-compile & dependency tools.​

$ sudo apt update
$ sudo apt install -y gcc-aarch64-linux-gnu libncurses-dev libssl-dev bison flex git make

Clone the Kernel Source​

$ wget https://github.com/TechNexion/linux-tn-imx/archive/refs/tags/archive/tn-imx_6.18.2_1.0.0-next.zip

Set cross-compile environment & the kernel config.​

$ export ARCH=arm64
$ export CROSS_COMPILE=/usr/bin/aarch64-linux-gnu-
$ cd linux-tn-imx
~/linux-tn-imx$ make imx_v8_defconfig

Compile the kernel & module driver.​

# compile kernel
~/linux-tn-imx$ make -j$(nproc)
# create kernel module folder
~/linux-tn-imx$ mkdir -p ./modules
# compile module driver
~/linux-tn-imx$ rm -rf ./modules/*
~/linux-tn-imx$ make INSTALL_MOD_PATH=./modules modules_install

Change kernel Image, DTB & modules.​

~/linux-tn-imx/$ cp arch/arm64/boot/Image  <mount_folder>/boot/Image
~/linux-tn-imx/$ cp arch/arm64/boot/dts/freescale/imx95-19x19-evk-tevs-tev-nxp.dts <mount_folder>/boot/
~/linux-tn-imx/$ sudo cp -r ./modules/lib/modules/* <mount_folder>/root/lib/modules/

Method 4 - Build custom Linux kernel with camera driver​

  1. Download the camera driver and device tree blobs.

    $ git clone https://github.com/TechNexion-Vision/nxp_evk_camera.git -b tn-imx_6.18.2_1.0.0-stable
  2. Copy to your kernel source code.

    $ cd nxp_evk_camera/
    ~/nxp_evk_camera$ cp -r driver/media/i2c/tevs/ <fetch_kernel_folder>/driver/media/i2c/

    ~/nxp_evk_camera$ cp arch/arm64/boot/dts/freescale/imx95-19x19-evk-tevs-tev-nxp.dts<fetch_kernel_folder>/arch/arm64/boot/dts/freescale/
  3. Modify makefile to add driver.

    $ cd <fetch_kernel_folder>/driver/media/i2c/
    ~/<fetch_kernel_folder>/driver/media/i2c/$ vi Makefile

    Add this line in Makefile.

    obj-$(CONFIG_VIDEO_TEVS) += tevs/
  4. Modify Kconfig to add camera config.

    ~/<fetch_kernel_folder>/driver/media/i2c/$ vi Kconfig

    Add this part under "Camera sensor devices" menu in Kconfig.

    config VIDEO_TEVS
    tristate "TechNexion TEVS sensor support"
    depends on OF
    depends on GPIOLIB
    select REGMAP_I2C
    select V4L2_CCI_I2C
    default m
    help
    This is a Video4Linux2 sensor driver for the TechNexion
    TEVS camera sensor with a MIPI CSI-2 interface.
  5. Modify makefile to add device tree.

    $ cd <fetch_kernel_folder>/arch/arm64/boot/dts/freescale/
    ~/<fatch_kernel_folder>/arch/arm64/boot/dts/freescale/$ vi Makefile

    Add this line in Makefile.

    imx95-19x19-evk-tevs-dtbs := imx95-19x19-evk.dtb imx95-19x19-evk-tevs-tev-nxp.dtbo
    dtb-$(CONFIG_ARCH_MXC) += imx95-19x19-evk-tevs.dtb
  6. Compile the kernel & module driver.

    Finally, you can start compiling your new Image files, then copy and replace the Image files in the SD card.


πŸ“Έ Camera Testing Instructions​

Specify Camera DTBO in U-Boot​

  1. Connect the debug console cable to the baseboard (via USB-C).

  2. Power on the board and interrupt the boot process. Keep pressing Enter when the following message appears: Hit any key to stop autoboot:

  3. Specify the appropriate device tree for your camera using the fdtfile environment variable in U-Boot:

u-boot=> setenv fdtfile imx95-19x19-evk-adv7535-tevs.dtb
  1. Save and continue the boot process:
u-boot=> saveenv
u-boot=> boot

Setup the media controller before camera streaming​

To verify that the camera has been properly connected and linked, use the media-ctl command:

$ media-ctl -d 8 -p

Get the media controller information as follows.

Media controller API version 6.18.2

Media device information
------------------------
driver mxc-isi
model FSL Capture Media Device
serial
bus info platform:4ad50000.isi
hw revision 0x0
driver version 6.18.2

Device topology
- entity 1: crossbar (13 pads, 10 links, 8 routes)
type V4L2 subdev subtype Unknown flags 0
device node name /dev/v4l-subdev8
routes:
2/0 -> 5/0 [ACTIVE]
2/0 -> 6/0 [ACTIVE]
2/0 -> 7/0 [ACTIVE]
2/0 -> 8/0 [ACTIVE]
2/0 -> 9/0 [ACTIVE]
2/0 -> 10/0 [ACTIVE]
2/0 -> 11/0 [ACTIVE]
2/0 -> 12/0 [ACTIVE]
pad0: SINK,MUST_CONNECT
pad1: SINK,MUST_CONNECT
pad2: SINK,MUST_CONNECT
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:srgb xfer:srgb ycbcr:601 quantization:lim-range]
<- "4ac10000.syscon:formatter@20":1 [ENABLED,IMMUTABLE]
pad3: SINK,MUST_CONNECT
pad4: SINK,MUST_CONNECT
<- "mxc_isi.output":0 [ENABLED,IMMUTABLE]
pad5: SOURCE
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:srgb xfer:srgb ycbcr:601 quantization:lim-range]
-> "mxc_isi.0":0 [ENABLED,IMMUTABLE]
pad6: SOURCE
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:srgb xfer:srgb ycbcr:601 quantization:lim-range]
-> "mxc_isi.1":0 [ENABLED,IMMUTABLE]
pad7: SOURCE
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:srgb xfer:srgb ycbcr:601 quantization:lim-range]
-> "mxc_isi.2":0 [ENABLED,IMMUTABLE]
pad8: SOURCE
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:srgb xfer:srgb ycbcr:601 quantization:lim-range]
-> "mxc_isi.3":0 [ENABLED,IMMUTABLE]
pad9: SOURCE
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:srgb xfer:srgb ycbcr:601 quantization:lim-range]
-> "mxc_isi.4":0 [ENABLED,IMMUTABLE]
pad10: SOURCE
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:srgb xfer:srgb ycbcr:601 quantization:lim-range]
-> "mxc_isi.5":0 [ENABLED,IMMUTABLE]
pad11: SOURCE
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:srgb xfer:srgb ycbcr:601 quantization:lim-range]
-> "mxc_isi.6":0 [ENABLED,IMMUTABLE]
pad12: SOURCE
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:srgb xfer:srgb ycbcr:601 quantization:lim-range]
-> "mxc_isi.7":0 [ENABLED,IMMUTABLE]

- entity 15: mxc_isi.0 (2 pads, 2 links, 0 routes)
type V4L2 subdev subtype Unknown flags 0
device node name /dev/v4l-subdev9
pad0: SINK
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
compose.bounds:(0,0)/1920x1080
compose:(0,0)/1920x1080]
<- "crossbar":5 [ENABLED,IMMUTABLE]
pad1: SOURCE
[stream:0 fmt:YUV8_1X24/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
crop.bounds:(0,0)/1920x1080
crop:(0,0)/1920x1080]
-> "mxc_isi.0.capture":0 [ENABLED,IMMUTABLE]

- entity 18: mxc_isi.0.capture (1 pad, 1 link)
type Node subtype V4L flags 0
device node name /dev/video0
pad0: SINK
<- "mxc_isi.0":1 [ENABLED,IMMUTABLE]

- entity 26: mxc_isi.1 (2 pads, 2 links, 0 routes)
type V4L2 subdev subtype Unknown flags 0
device node name /dev/v4l-subdev10
pad0: SINK
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
compose.bounds:(0,0)/1920x1080
compose:(0,0)/1920x1080]
<- "crossbar":6 [ENABLED,IMMUTABLE]
pad1: SOURCE
[stream:0 fmt:YUV8_1X24/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
crop.bounds:(0,0)/1920x1080
crop:(0,0)/1920x1080]
-> "mxc_isi.1.capture":0 [ENABLED,IMMUTABLE]

- entity 29: mxc_isi.1.capture (1 pad, 1 link)
type Node subtype V4L flags 0
device node name /dev/video1
pad0: SINK
<- "mxc_isi.1":1 [ENABLED,IMMUTABLE]

- entity 37: mxc_isi.2 (2 pads, 2 links, 0 routes)
type V4L2 subdev subtype Unknown flags 0
device node name /dev/v4l-subdev11
pad0: SINK
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
compose.bounds:(0,0)/1920x1080
compose:(0,0)/1920x1080]
<- "crossbar":7 [ENABLED,IMMUTABLE]
pad1: SOURCE
[stream:0 fmt:YUV8_1X24/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
crop.bounds:(0,0)/1920x1080
crop:(0,0)/1920x1080]
-> "mxc_isi.2.capture":0 [ENABLED,IMMUTABLE]

- entity 40: mxc_isi.2.capture (1 pad, 1 link)
type Node subtype V4L flags 0
device node name /dev/video2
pad0: SINK
<- "mxc_isi.2":1 [ENABLED,IMMUTABLE]

- entity 48: mxc_isi.3 (2 pads, 2 links, 0 routes)
type V4L2 subdev subtype Unknown flags 0
device node name /dev/v4l-subdev12
pad0: SINK
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
compose.bounds:(0,0)/1920x1080
compose:(0,0)/1920x1080]
<- "crossbar":8 [ENABLED,IMMUTABLE]
pad1: SOURCE
[stream:0 fmt:YUV8_1X24/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
crop.bounds:(0,0)/1920x1080
crop:(0,0)/1920x1080]
-> "mxc_isi.3.capture":0 [ENABLED,IMMUTABLE]

- entity 51: mxc_isi.3.capture (1 pad, 1 link)
type Node subtype V4L flags 0
device node name /dev/video3
pad0: SINK
<- "mxc_isi.3":1 [ENABLED,IMMUTABLE]

- entity 59: mxc_isi.4 (2 pads, 2 links, 0 routes)
type V4L2 subdev subtype Unknown flags 0
device node name /dev/v4l-subdev13
pad0: SINK
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
compose.bounds:(0,0)/1920x1080
compose:(0,0)/1920x1080]
<- "crossbar":9 [ENABLED,IMMUTABLE]
pad1: SOURCE
[stream:0 fmt:YUV8_1X24/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
crop.bounds:(0,0)/1920x1080
crop:(0,0)/1920x1080]
-> "mxc_isi.4.capture":0 [ENABLED,IMMUTABLE]

- entity 62: mxc_isi.4.capture (1 pad, 1 link)
type Node subtype V4L flags 0
device node name /dev/video4
pad0: SINK
<- "mxc_isi.4":1 [ENABLED,IMMUTABLE]

- entity 70: mxc_isi.5 (2 pads, 2 links, 0 routes)
type V4L2 subdev subtype Unknown flags 0
device node name /dev/v4l-subdev14
pad0: SINK
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
compose.bounds:(0,0)/1920x1080
compose:(0,0)/1920x1080]
<- "crossbar":10 [ENABLED,IMMUTABLE]
pad1: SOURCE
[stream:0 fmt:YUV8_1X24/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
crop.bounds:(0,0)/1920x1080
crop:(0,0)/1920x1080]
-> "mxc_isi.5.capture":0 [ENABLED,IMMUTABLE]

- entity 73: mxc_isi.5.capture (1 pad, 1 link)
type Node subtype V4L flags 0
device node name /dev/video5
pad0: SINK
<- "mxc_isi.5":1 [ENABLED,IMMUTABLE]

- entity 81: mxc_isi.6 (2 pads, 2 links, 0 routes)
type V4L2 subdev subtype Unknown flags 0
device node name /dev/v4l-subdev15
pad0: SINK
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
compose.bounds:(0,0)/1920x1080
compose:(0,0)/1920x1080]
<- "crossbar":11 [ENABLED,IMMUTABLE]
pad1: SOURCE
[stream:0 fmt:YUV8_1X24/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
crop.bounds:(0,0)/1920x1080
crop:(0,0)/1920x1080]
-> "mxc_isi.6.capture":0 [ENABLED,IMMUTABLE]

- entity 84: mxc_isi.6.capture (1 pad, 1 link)
type Node subtype V4L flags 0
device node name /dev/video6
pad0: SINK
<- "mxc_isi.6":1 [ENABLED,IMMUTABLE]

- entity 92: mxc_isi.7 (2 pads, 2 links, 0 routes)
type V4L2 subdev subtype Unknown flags 0
device node name /dev/v4l-subdev16
pad0: SINK
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
compose.bounds:(0,0)/1920x1080
compose:(0,0)/1920x1080]
<- "crossbar":12 [ENABLED,IMMUTABLE]
pad1: SOURCE
[stream:0 fmt:YUV8_1X24/1920x1080 field:none colorspace:jpeg xfer:srgb ycbcr:601 quantization:full-range
crop.bounds:(0,0)/1920x1080
crop:(0,0)/1920x1080]
-> "mxc_isi.7.capture":0 [ENABLED,IMMUTABLE]

- entity 95: mxc_isi.7.capture (1 pad, 1 link)
type Node subtype V4L flags 0
device node name /dev/video7
pad0: SINK
<- "mxc_isi.7":1 [ENABLED,IMMUTABLE]

- entity 103: mxc_isi.output (1 pad, 1 link)
type Node subtype V4L flags 0
pad0: SOURCE
-> "crossbar":4 [ENABLED,IMMUTABLE]

- entity 110: 4ac10000.syscon:formatter@20 (2 pads, 2 links, 1 route)
type V4L2 subdev subtype Unknown flags 0
device node name /dev/v4l-subdev17
routes:
0/0 -> 1/0 [ACTIVE]
pad0: SINK
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:smpte170m xfer:709 ycbcr:601 quantization:lim-range]
<- "csidev-4ad30000.csi":1 [ENABLED,IMMUTABLE]
pad1: SOURCE
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:smpte170m xfer:709 ycbcr:601 quantization:lim-range]
-> "crossbar":2 [ENABLED,IMMUTABLE]

- entity 115: csidev-4ad30000.csi (2 pads, 2 links, 1 route)
type V4L2 subdev subtype Unknown flags 0
device node name /dev/v4l-subdev18
routes:
0/0 -> 1/0 [ACTIVE]
pad0: SINK
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:smpte170m xfer:709 ycbcr:601 quantization:lim-range]
<- "tevs 2-0048":0 []
pad1: SOURCE
[stream:0 fmt:UYVY8_1X16/1920x1080 field:none colorspace:smpte170m xfer:709 ycbcr:601 quantization:lim-range]
-> "4ac10000.syscon:formatter@20":0 [ENABLED,IMMUTABLE]

- entity 120: tevs 2-0048 (1 pad, 1 link, 0 routes)
type V4L2 subdev subtype Sensor flags 0
device node name /dev/v4l-subdev19
pad0: SOURCE
[stream:0 fmt:UYVY8_1X16/640x480@1/60 field:none colorspace:srgb xfer:srgb ycbcr:601 quantization:full-range
crop.bounds:(0,0)/3840x2160
crop:(0,0)/640x480]
-> "csidev-4ad30000.csi":0 []

Transfer to image that will be easier to understand.

$ media-ctl --print-dot > graph.dot
$ dot -Tpng graph.dot > graph.png
# if you don't have tool, you need to install it as follows.
# sudo apt-get install -y graphviz

Modify the route through the β€œcrossbar” and only keep the channel of video0.

$ media-ctl -d /dev/media8 -R '1 [2/0 -> 5/0 [1], 2/0 -> 6/0 [0], 2/0 -> 7/0 [0], 2/0 -> 8/0 [0], 2/0 -> 9/0 [0], 2/0 -> 10/0 [0], 2/0 -> 11/0 [0], 2/0 -> 12/0 [0]]'

Enable the link between TEVS and CSI device.

$ media-ctl -d /dev/media8 -l '120:0 -> 115:0 [1]'

You can list camera formats, resolutions and frame interval via v4l2 control command.

# formats
$ v4l2-ctl -d /dev/v4l-subdev19 --list-subdev-mbus-codes
ioctl: VIDIOC_SUBDEV_ENUM_MBUS_CODE (pad=0,stream=0)
0x200f: MEDIA_BUS_FMT_UYVY8_1X16

# resolutions
$ v4l2-ctl -d /dev/v4l-subdev19 --list-subdev-framesize code=0x200f
ioctl: VIDIOC_SUBDEV_ENUM_FRAME_SIZE (pad=0,stream=0)
Size Range: 640x480 - 640x480
Size Range: 1280x720 - 1280x720
Size Range: 1920x1080 - 1920x1080
Size Range: 2560x1440 - 2560x1440
Size Range: 3840x2160 - 3840x2160

# frame interval of resolution
$ v4l2-ctl -d /dev/v4l-subdev19 --list-subdev-frameintervals width=640,height=480,code=0x200f
ioctl: VIDIOC_SUBDEV_ENUM_FRAME_INTERVAL (pad=0,stream=0)
Interval: 0.017s (60.000 fps)
Interval: 0.033s (30.000 fps)
Interval: 0.050s (20.000 fps)
Interval: 0.067s (15.000 fps)
Interval: 0.100s (10.000 fps)
Interval: 0.200s (5.000 fps)

$ v4l2-ctl -d /dev/v4l-subdev19 --list-subdev-frameintervals width=1280,height=720,code=0x200f
ioctl: VIDIOC_SUBDEV_ENUM_FRAME_INTERVAL (pad=0,stream=0)
Interval: 0.017s (60.000 fps)
Interval: 0.033s (30.000 fps)
Interval: 0.050s (20.000 fps)
Interval: 0.067s (15.000 fps)
Interval: 0.100s (10.000 fps)
Interval: 0.200s (5.000 fps)

$ v4l2-ctl -d /dev/v4l-subdev19 --list-subdev-frameintervals width=1920,height=1080,code=0x200f
ioctl: VIDIOC_SUBDEV_ENUM_FRAME_INTERVAL (pad=0,stream=0)
Interval: 0.017s (60.000 fps)
Interval: 0.033s (30.000 fps)
Interval: 0.050s (20.000 fps)
Interval: 0.067s (15.000 fps)
Interval: 0.100s (10.000 fps)
Interval: 0.200s (5.000 fps)

$ v4l2-ctl -d /dev/v4l-subdev19 --list-subdev-frameintervals width=2560,height=1440,code=0x200f
ioctl: VIDIOC_SUBDEV_ENUM_FRAME_INTERVAL (pad=0,stream=0)
Interval: 0.033s (30.000 fps)
Interval: 0.050s (20.000 fps)
Interval: 0.067s (15.000 fps)
Interval: 0.100s (10.000 fps)
Interval: 0.200s (5.000 fps)

$ v4l2-ctl -d /dev/v4l-subdev19 --list-subdev-frameintervals width=3840,height=2160,code=0x200f
ioctl: VIDIOC_SUBDEV_ENUM_FRAME_INTERVAL (pad=0,stream=0)
Interval: 0.067s (15.000 fps)
Interval: 0.100s (10.000 fps)
Interval: 0.200s (5.000 fps)

Set the media controller resolution to 1280Γ—720 at 30 FPS.

$ media-ctl -d 8 -V '120:0 [fmt:UYVY8_1X16/1280x720@1/30 field:none]'
$ media-ctl -d 8 -V '115:0 [fmt:UYVY8_1X16/1280x720 field:none]'
$ media-ctl -d 8 -V '110:0 [fmt:UYVY8_1X16/1280x720 field:none]'
$ media-ctl -d 8 -V '1:2 [fmt:UYVY8_1X16/1280x720 field:none]'
$ media-ctl -d 8 -V '15:0 [fmt:UYVY8_1X16/1280x720 field:none]'

πŸŽ₯ Start Camera Video Stream via GStreamer​

Launch GStreamer Pipeline​

Specify the capture device you just get and start gstreamer to get video stream on screen.

$ gst-launch-1.0 v4l2src device=/dev/video0 ! "video/x-raw, format=YUY2, width=1280, height=720" ! fpsdisplaysink video-sink=glimagesink sync=false -v

Switch to 640x480 at 60 FPS.

$ media-ctl -d 8 -V '120:0 [fmt:UYVY8_1X16/640x480@1/60 field:none]'
$ media-ctl -d 8 -V '115:0 [fmt:UYVY8_1X16/640x480 field:none]'
$ media-ctl -d 8 -V '110:0 [fmt:UYVY8_1X16/640x480 field:none]'
$ media-ctl -d 8 -V '1:2 [fmt:UYVY8_1X16/640x480 field:none]'
$ media-ctl -d 8 -V '15:0 [fmt:UYVY8_1X16/640x480 field:none]'

$ gst-launch-1.0 v4l2src device=/dev/video0 ! "video/x-raw, format=YUY2, width=640, height=480" ! fpsdisplaysink video-sink=glimagesink sync=false -v

Switch to 3840x2160 at 15 FPS.

$ media-ctl -d 8 -V '120:0 [fmt:UYVY8_1X16/3840x2160@1/15 field:none]'
$ media-ctl -d 8 -V '115:0 [fmt:UYVY8_1X16/3840x2160 field:none]'
$ media-ctl -d 8 -V '110:0 [fmt:UYVY8_1X16/3840x2160 field:none]'
$ media-ctl -d 8 -V '1:2 [fmt:UYVY8_1X16/3840x2160 field:none]'
$ media-ctl -d 8 -V '15:0 [fmt:UYVY8_1X16/3840x2160 field:none]'

$ gst-launch-1.0 v4l2src device=/dev/video0 ! "video/x-raw, format=YUY2, width=3840, height=2160" ! fpsdisplaysink video-sink=glimagesink sync=false -v

🚨 Troubleshooting​

Boot up NXP IMX95LPD5EVK-19CM and check initialization of TEVS driver. If it shows below messages, the driver is initialized correctly.

$ dmesg -t | grep tevs
tevs 2-0048: tevs_probe() device node: tevs@48
tevs 2-0048: Version:26.3.0.1
tevs 2-0048: Product:TEVS-AR0822, HeaderVer:3, MIPI_Rate:800
tevs 2-0048: Chip ID: 0x0F56
tevs 2-0048: probe success

Tune the exposure mode and value to obtain higher framerate.

$ v4l2-ctl -d /dev/v4l-subdev19 --set-ctrl=exposure_mode=0
$ v4l2-ctl -d /dev/v4l-subdev19 --set-ctrl=exposure=1000